Pumps and Motors

Practical guides for electricians, technicians, and engineers working with electric motors: testing and troubleshooting, overload and cable sizing, and industrial motor control centers (MCCs). Start with the guides below, or browse every article underneath.

Motor Testing and Winding Resistance

Motor Protection, Sizing and Calculations

Motor Control Centers (MCC)

Quick Guidance

Winding resistance vs insulation resistance: A winding resistance test uses a low-ohm meter to find open windings, shorted turns, and imbalance between phases. An insulation resistance test uses a megohmmeter to check the insulation between the windings and the motor frame. They detect different faults, so run both when troubleshooting.

Overload vs conductor sizing: Overload relays are set from the motor nameplate current, while conductors and branch-circuit protection are sized using code tables (NEC Article 430 in the US, or your local equivalent). Always confirm against the nameplate and the code edition your jurisdiction enforces.

Need a quick calculation? Try our electrical calculators for cable sizing and related motor calculations.